Loading...
Groups source: ARIS

Research Group for production Management

Research activity

Code Science Field Subfield
2.10.05  Engineering sciences and technologies  Manufacturing technologies and systems  Industrial engineering 
Keywords
Product development, production planning, production control, production systems
Evaluation (metodology)
source: COBISS
Points
5,374.92
A''
687.59
A'
1,873.63
A1/2
3,110.73
CI10
1,469
CImax
80
h10
20
A1
17.82
A3
0.83
Data for the last 5 years (citations for the last 10 years) on October 15, 2025; Data for score A3 calculation refer to period 2020-2024
Database Linked records Citations Pure citations Average pure citations
WoS 112  1,311  1,183  10.56 
Scopus 138  1,821  1,657  12.01 
Researchers (8)
no. Code Name and surname Research area Status No. of publicationsNo. of publications
1.  06674  PhD Borut Buchmeister  Manufacturing technologies and systems  Researcher  925 
2.  61107  Jana Cafuta  Manufacturing technologies and systems  Researcher 
3.  55695  Aljaž Javernik  Manufacturing technologies and systems  Researcher  34 
4.  55910  Klemen Kovič  Manufacturing technologies and systems  Researcher  27 
5.  39211  PhD Robert Ojsteršek  Manufacturing technologies and systems  Researcher  170 
6.  20230  PhD Iztok Palčič  Manufacturing technologies and systems  Researcher  662 
7.  58580  Rosanda Vujica Beharić  Manufacturing technologies and systems  Researcher  24 
8.  17111  PhD Nataša Vujica Herzog  Manufacturing technologies and systems  Researcher  264 
ARIS research and infrastructure programmes (5) Legend
no. Code Title Period Head of the group No. of publicationsNo. of publications
1.  P2-0190  Advanced concepts of production management and dimensional metrology  1/1/2018 - 12/31/2027  PhD Bojan Ačko  3,190 
2.  P2-0190  Advanced concepts of production management and dimensional metrology  1/1/2013 - 12/31/2017  PhD Bojan Ačko  3,543 
3.  P2-0190  Advanced concepts of production management and dimensional metrology  1/1/2009 - 12/31/2012  PhD Bojan Ačko  4,988 
4.  P2-0190  Advanced concepts of production management and dimensional metrology  1/1/2004 - 12/31/2008  PhD Andrej Polajnar  5,420 
5.  P0-0501-0795  The planning of production systems and dimensional metrology  1/1/1999 - 12/31/2003  PhD Andrej Polajnar  5,017 
Views history
Favourite