L2-9472 — Final report
1.
The environmental impact of the planned pumping power station on the River Drava in Slovenia

On the conference the project was presented whose objectives were hydro geological and environmental investigations, the analyses of hydro geological conditions, determination of monitoring type and extent, and estimation of the influences of the pumping power station and water-storage on the hydro geological conditions.

COBISS.SI-ID: 11298070
2.
Analysis of concentration and sedimentation of suspended load in the reservoirs.

This paper deals with the sedimentation of suspended load in the reservoirs. As an example the reservoir of the hydroelectric power plant Boštanj on the Sava River is shown. The objective of the described studies was to determine the quantity and type of deposited material in the reservoir. Considering the actual discharge of water during the selected time period and the examined ratio between the flow rate of the water and the quantity of suspended and deposited material, the total quantity of sedimented material in this period was estimated.

COBISS.SI-ID: 12906006
3.
Analyses of the suspended-load sedimentation process and its dynamics in reservoirs with high daily oscillations.

This paper presents an analysis of the suspended-load sedimentation process that is based on the interaction between the sedimentation, i.e., the settling, velocity and the motion of the water. Laboratory investigations of the suspended material from the river-water samples have determined the ratio between the particle size and the concentration of suspended material with respect to the river discharge. The motion of the water in the reservoirs with high daily oscillations is solved by the three-dimensional modeling of the liquid streams.

COBISS.SI-ID: 12905750
4.
The suspended load in the water-storage reservoir of the hydroelectric power plant Boštanj on the Sava River.

The paper, which has been presented on the conference River Basin Management 2009 on Malta, deals with the sedimentation of suspended material in the reservoir of the hydroelectric power plant Boštanj on the Sava River. The primary goal of research presented was to determine the quntity and properties of sedimented material in reservoir during the selected time period.

COBISS.SI-ID: 13454870