N1-0093 — Interim report
1.
Robust scheduling of waste wood processing plants with uncertain delivery sources and quality

The paper considers production scheduling at a single node of a logistics network (waste wood processing facility). Optimization of this node is considered both with single and mulitple objective, one of which is energy minimization.

COBISS.SI-ID: 61491459
2.
Robust reverse logistics network design

This paper considers robust network-level optimization of a waste wood reverse logistics network, and proposes optimal placement of facilities in case of facility failures.

COBISS.SI-ID: 42886915
3.
Graph coloring based heuristic for crew rostering

In this paper an optimal human resource scheduling solution is developed for transportation and logistics. The human resource cost in the management of supply chains is crucial , thus it is also in the focus of the project. A network based method is applied and the efficiency is tested on simulated and real-world data.

COBISS.SI-ID: 26713603